PYLUSD Gym Floor & Bleachers
🏫 Project Overview
• Drawings
• Owner: Placentia-Yorba Linda Unified School District (PYLUSD)
• Type: Public works project, DSA (Division of State Architect) governed
• Estimated Cost: No engineer’s estimate; bids should reflect market value
• The project requires a Class B license at the time of bid submission.
• Bidders must comply with the City's Living Wage Ordinance and the Santa Monica Oaks Initiative.
• The project is subject to prevailing wage laws and requires bidders to submit a prevailing wage acknowledgement form.
• Bidders must also submit a non-collusion declaration form and a subcontractor list.
Bid Due Date: October 30
Bid Delivery Location:
PYLUSD Purchasing Department (2nd floor of the two-story building, left of the elevator/stairs)
Note: If shipping via UPS/FedEx, allow extra time — packages go to a warehouse first and may be delayed.
Board Award Target: November board meeting
Project Schedule:
Start: June 16
End: August 14
Work must be completed during the summer break. No schedule flexibility.
Contact Information:
Don Rosales (Director of Purchasing)
(714) 985-8474
Audio of briefing
Transcript of briefing
Project Overview
Bid #: 22606
Project: Valencia High School Gym – Bleacher and Flooring Replacement
Owner: Placentia-Yorba Linda Unified School District (PYLUSD)
Type: Public works project, DSA (Division of State Architect) governed
Estimated Cost: No engineer’s estimate; bids should reflect market value
Key Dates
Bid Due Date: October 30
Bid Delivery Location:
PYLUSD Purchasing Department (2nd floor of the two-story building, left of the elevator/stairs)
Note: If shipping via UPS/FedEx, allow extra time — packages go to a warehouse first and may be delayed.
Board Award Target: November board meeting
Project Schedule:
Start: June 16
End: August 14
Work must be completed during the summer break. No schedule flexibility.
Accessing Bid Documents
Available at: pylusd.org → Divisions → Business Services → Purchasing
Documents include:
Bid form and requirements
PDF blueprints/drawings (can zoom in on the digital file)
Bid bond and allowance information
Bond & Allowance Requirements
Bid Bond: 10% of total bid amount (including allowance).
Payment & Performance Bonds: 100% required post-award.
Notice to Proceed is not issued until all documentation (bonds, insurance, etc.) is received.
Delays in submittals = delays in project start.
Sign-In & Site Procedures
On-Site Sign-In:
Upon visiting Valencia High School, sign in with Max (construction manager).
If you don’t sign in at the site, your bid will not be accepted.
Front Office Check-In:
All personnel (including subs) must scan their ID at the school office for a background check.
No printed badge = no site access.
No badge-sharing allowed; violations result in removal from the site.
Communication & RFIs
Primary Contacts:
Project Manager: [Name not stated – likely speaker]
Project Specialist: Tammy (her card was distributed).
All RFIs/questions must be emailed to both Tammy and the Project Manager.
Only the Purchasing Department can issue:
Addenda
Official written responses
Responses:
Simple questions → included in a Q&A sheet
Complex RFIs → issued as addenda
🧱
Scope Notes
Scope: Full gym flooring and bleacher replacement, including ADA upgrades and site work as required by DSA.
Bleacher System:
Plans specify Hussey bleachers.
No substitutions at this stage; alternate systems would require DSA re-approval, which is not feasible within the schedule.
No prequalification required unless project value exceeds $1M.
📍
Pre-Bid Walkthrough Details
Location: 500 N. Bradford Ave, Placentia, CA (Valencia High School)
Meeting Point: Front of campus on Bradford.
Max will meet attendees and send them into the office individually for ID scanning.
After scanning, return to sign in before the site visit begins.
Safety & Courtesy:
School will be in session.
No smoking, minimal noise, respect student presence.
📬
Administrative Notes
Business cards requested for contact accuracy (for emailing addenda, updates, and clarifications).
All project communication, updates, and documents distributed via email and posted on the PYLUSD website.
Concise Context Recap
This was a pre-bid meeting for the Valencia High School Gym Bleacher and Floor Replacement project under PYLUSD Bid 22606. The meeting clarified procedures for accessing bid documents, submitting bids, sign-in requirements, and site access rules. The district emphasized strict compliance with documentation, safety, and delivery deadlines. Bidders must coordinate through Purchasing and Project Specialist Tammy for all questions or RFIs. The work window is limited to summer break, with no flexibility, and Hussey bleachers are the approved standard per DSA requirements.